Builder: Freie und Hansestadt HH, Behörde f.Stadtentw.
Location: Hamburg
Mountain formation: Tertiär-UBKS -OBKS
Drilling method: Air-lift drilling method
Number of holes: 2
Drilling depth in m: 309
Total drilling meters: 549
Drilling Ø in mm: 350
Expansion dates: DN 65/125/Norip
Purpose of the drilling:
Exploration and measuring point drilling for the Free and Hanseatic City of Hamburg Authority for Urban Development.
Additional explanations:
Delivery of 2 pieces. Exploration and measuring point drillings GWM 3383 and 3384 in the area of the Moorburg Elbe dike 221 as air lifting drillings up to 309.00 m and 240.00 m below GOK with 350 mm Ø. The two boreholes were expanded with filter and solid pipes DN 65/125 made by Norip and, after filling the filter sections with glass balls over cementing pieces, each was grouted with a clay powder cement suspension up to GOK. Both GWMs were then sanded and pumping tests were carried out. The GWM 3383 had artesian conditions.
NORD Bohr und Brunnenbau GmbH
Randersweide 1 | D 21035 Hamburg
Fon +49 40 735 956 – 30
Fax +49 40 735 956 – 40
E-Mail info(at)nord-bb.de