Groundwater lowering 5 wells 1 groundwater measuring point
Relaxation dewatering with a withdrawal rate of 200 m³/h. 2 weeks after the dewatering was completed, the 5 wells were dismantled in accordance with the water management's specifications. Provision of emergency power with remote monitoring and continuous data recording.