Builder: WBV Nord Oeversee
Location: Oeversee
Mountain formation: Loose formation
Drilling method: Well investigation cleaning, tailings
Number of holes: 8
Drilling depth in m: 283
Total drilling meters: 1870
Drilling Ø in mm: different
Expansion dates: different
Examination of 8 pieces. Process water well at WBV Nord in Oeversee. The conveyor systems for all wells were removed and installed and visually examined using an underwater camera. Wells 3 and 8.1 were cleaned mechanically.
The deposits in wells 3, 7b and 8.1 were vacuumed out and the filter section in well 7b was partially backfilled. In addition to the optical inspection, annulus control measurements were carried out at Altbrunnen 3.
NORD Bohr und Brunnenbau GmbH
Randersweide 1 | D 21035 Hamburg
Fon +49 40 735 956 – 30
Fax +49 40 735 956 – 40
E-Mail info(at)nord-bb.de