Paper factory Tornesch

Builder: Paper factory Tornesch

Location: Tornesch

Mountain formation: Loose formation

Drilling method: Dry pressure flushing hole

Number of holes: 1

Drilling depth in m: 250

Total drilling meters: 250

Drilling Ø in mm: 324/273/180

Expansion data: DN 65/115/Norip

Purpose of the drilling:

Pre-drilling for a new well location at the Tornesch paper mill.
GWM AB 1 for well 5 – up to 37 m dry drilling, up to 250 m using pressure drilling.

The exploration borehole AB 1 on the site of the Tornesch paper factory was sunk up to 250 m below GOK as a preliminary borehole for the new well construction Br. 5, expanded into a GWM and operated over a longer period of time to control the water quality.