Munster | Brunnen

Builder: Stadtwerke Munster-Bispingen GmbH

Location: Munster-Bispingen

Mountain formation:Loose formations

Drilling method:Air lifting drill
RKR core drilling

Number of holes: 1

Drilling depth in m: 107

Total drilling meters: 107

Drilling Ø in mm: 800

Expansion data: DN 400 / VA / KV

Purpose of the drilling:

Delivery of 1 piece. Test well for a planned new WW. In advance, an AB was sunk to 64.00 m below GOK using the air-lift drilling method and to 110.00 m below GOK using the RKR core drilling method.

Sinking the test well 1 for the planned new waterworks using air lifting - drilling method with 800 mm Ø. After reaching the final depth of 107 m below GOK, wound wire filters made of stainless steel and solid pipes made of KV plastic made by Noresta as well as a DN 65 Norip monitoring pipe were installed. The filter section was then gravelled, a clay barrier with Quellon HD was poured and the annulus up to GOK was filled with a clay powder cement suspension. Finally, intensive sand removal and the power pumping test were carried out. A well shaft and the conveyor system will only be installed after the experimental operation has been completed.

English (UK)