Flensburg | Brunnen B5 WW Süd

Builder: Stadtwerke Flensburg

Location: WW Süd

Mountain formation: Tertiary

Drilling method: Air lifting drill

Number of holes: 1

Drilling depth in m: 312

Total drilling meters: 312

Drilling Ø in mm: 1250/800/600/450

Expansion data: 508/St./DN 250/VA

Purpose of the drilling:

New well construction – Well 5 – WW Süd Stadtwerke Flensburg

Construction of the replacement fountain, Br. 5, in the Flensburg municipal waterworks south and dismantling of the old fountain, Br. 3. After intensive sand removal, the power pumping test was carried out in three performance levels 150 – 200 – 270 m³/h. The drilling process was delayed by several layers of rubble embedded in the till. After the shaft had been set, the conveyor system supplied by the municipal utilities was installed.

Flensburg | Brunnen B5 WW Süd

Builder: Stadtwerke Flensburg

Location: WW Süd

Mountain formation: Tertiary

Drilling method: Air lifting drill

Number of holes: 1

Drilling depth in m: 312

Total drilling meters: 312

Drilling Ø in mm: 1250/800/600/450

Expansion data: 508/St./DN 250/VA

Purpose of the drilling: 

New well construction – Well 5 – WW Süd Stadtwerke Flensburg

Construction of the replacement fountain, Br. 5, in the Flensburg municipal waterworks south and dismantling of the old fountain, Br. 3. After intensive sand removal, the power pumping test was carried out in three performance levels 150 – 200 – 270 m³/h. The drilling process was delayed by several layers of rubble embedded in the till. After the shaft had been set, the conveyor system supplied by the municipal utilities was installed.