Builder: TWL Technische Werke Ludwigshafen AG
Location: Ludwigshafen
Mountain formation:Loose formation
Drilling method: Overbore
Number of holes: 1
Drilling depth in m: 328
Total drilling meters: 328
Drilling Ø in mm: 950
Expansion data: DN 400/VA/WDF/AR
Purpose of the drilling:
Well P 71 of TWL Ludwigshafen AG Renovation by over-drilling the DN 400 Rilsan - expansion piping and new filtering.
Renovation of the well Br. P 71 of TWL Ludwigshafen AG on a very cramped site. High effort for noise protection measures. Complete renovation of Br. P 71 by over-drilling the old wells - expansion pipework DN 400 Rilsan, drilling the borehole from 750 mm to 950 mm Ø and new filtering with DN 400 V4A/WDF - AR. Since Br. P 71 is in the flood area, a waterproof stainless steel shaft with a 3 m high standpipe was installed to accommodate electrical power.
NORD Bohr und Brunnenbau GmbH
Randersweide 1 | D 21035 Hamburg
Fon +49 40 735 956 – 30
Fax +49 40 735 956 – 40
E-Mail info(at)nord-bb.de